Silver Coin Project - Drill History
Esso, Westmin, and Tenajon 1982-1994
- Aggressive surface and underground drilling
- Combined surface and underground drilling of 422 holes/37,321m
- Defined underground mineable deposit and mined ~ 120,000 tons @ 8 g/t Au for ~ 30,000 oz. Au
Pinnacle/Mountain Boy 2004-2008
- Aggressive exploration program by Mountain Boy and Pinnacle from 2004 – 2008 consisting of surface diamond drilling and trenching
- 320 holes drilled from surface totaling 50,248 m
- Most drilling concentrated on the property’s Kansas claim
- 75 surface trenches completed, for a total of 1447 meters
Jayden Resources 2010
- 18 holes, 2801 meters
- Significant high-grade intercepts
- Extended mineralization 160m to the north
Historical Core Drilling at Silver Coin
Underground Drilling (Historical):
Surface Drilling (Historical):
Surface Drilling (Pinnacle):
Surface Drilling (Jayden):
Total Drilling:
Total Meters:
Surface Drilling (Historical):
Surface Drilling (Pinnacle):
Surface Drilling (Jayden):
Total Drilling:
Total Meters:
293 holes
129 holes
320 holes
18 holes
760 holes
90,370m
129 holes
320 holes
18 holes
760 holes
90,370m
Mineralization
- Mineralization across the property is contained within 20 different zones, most significant is the Main Breccia Zone:
- 700 to 1000 meters long
- 300 to 500 meters wide
- Up to 100 meters in thickness
- Irregular sulfide lenses & masses
- Mineralization is structurally controlled, with strong potassic and phyllic wall rock alteration and silicification
- Additional zones yet to be explored